to the construction site by 9 cubic meters truck mixer. The driving time took 35 - 45 minutes and the pouring of the forms another 10 - 15 minutes. According to our customer, the flow properties of the UHPC concrete were very good during casting. It required very good flow properties because the casting mold was very complex in geometry and bubbles should not form in any case. The compressive strength achieved was 190 MPa. The customer's requirement was 175 MPa.
WPE DK International
Phone: 0049 176 601 73146
E-mail: info@wpe-dk.dk
Homepage: www.wpe-dk.com
No comments:
Post a Comment